CBC回訪2021年洪災後的Abbotsford,農戶仍擔憂Sumas Prairie再次受淹。市長Ross Siemens稱約200處防洪地點已有改善,Barrowtown泵站亦在升級,但長期計劃仍需約15億加元,包括泵站、堤壩及蓄洪空間。
省府已提供7,660萬元用於關鍵泵站升級。聯邦與卑詩7月承諾最多2,000萬元用於Fraser Valley防洪規劃及初期項目管理,市方認爲這是籌備而非足夠的工程建設資金。
聯邦回應稱正與各級政府及原住民合作制定綜合方案,尋求可儘快推進的項目。報道是災後進展審視,不是當前正在發生洪災的警報,歷史洪水照片亦應按原日期理解。
來源:CBC News 原報道。大魚新聞整理原創中文摘要;保留原刊發日期。

Five years after a catastrophic flood, Abbotsford leaders are calling on Ottawa to better protect the Sumas Prairie by funding long-term flood mitigation. (GP Mendoza/CBC)

A man walks his dog near a submerged Highway 1 after a major flood event in Abbotsford, B.C., on Nov. 17, 2021. (Ben Nelms/CBC)

Dave Martens, owner of Bright Meadow Farms, is pictured in Abbotsford, B.C., on Nov. 10, 2026. He hopes to see more urgent action to protect the future of farming in the Sumas Prairie. (Ethan Cairns/CBC)

Avtar Dhillon, who operates a saffron farm, is still dealing with the destruction of his rental property, which was gutted by the flood. He is pictured on Nov. 10 in Abbotsford, B.C. (Baneet Braich/CBC)

The province has provided $76.6 million for critical upgrades to the Barrowtown Pump Station to better withstand floodwaters from the Sumas and Nooksack rivers. Construction is pictured in Abbotsford, B.C., on Tuesday, Nov. 10, 2026. (Ethan Cairns/CBC)

Ottawa says a comprehensive flood mitigation plan for the Sumas Prairie remains under development. The region is pictured in Abbotsford, B.C., on Jan. 26, 2026. (Ben Nelms/CBC)



