CBC回访2021年洪灾后的Abbotsford,农户仍担忧Sumas Prairie再次受淹。市长Ross Siemens称约200处防洪地点已有改善,Barrowtown泵站亦在升级,但长期计划仍需约15亿加元,包括泵站、堤坝及蓄洪空间。
省府已提供7,660万元用于关键泵站升级。联邦与卑诗7月承诺最多2,000万元用于Fraser Valley防洪规划及初期项目管理,市方认为这是筹备而非足够的工程建设资金。
联邦回应称正与各级政府及原住民合作制定综合方案,寻求可尽快推进的项目。报道是灾后进展审视,不是当前正在发生洪灾的警报,历史洪水照片亦应按原日期理解。
来源:CBC News 原报道。大鱼新闻整理原创中文摘要;保留原刊发日期。

Five years after a catastrophic flood, Abbotsford leaders are calling on Ottawa to better protect the Sumas Prairie by funding long-term flood mitigation. (GP Mendoza/CBC)

A man walks his dog near a submerged Highway 1 after a major flood event in Abbotsford, B.C., on Nov. 17, 2021. (Ben Nelms/CBC)

Dave Martens, owner of Bright Meadow Farms, is pictured in Abbotsford, B.C., on Nov. 10, 2026. He hopes to see more urgent action to protect the future of farming in the Sumas Prairie. (Ethan Cairns/CBC)

Avtar Dhillon, who operates a saffron farm, is still dealing with the destruction of his rental property, which was gutted by the flood. He is pictured on Nov. 10 in Abbotsford, B.C. (Baneet Braich/CBC)

The province has provided $76.6 million for critical upgrades to the Barrowtown Pump Station to better withstand floodwaters from the Sumas and Nooksack rivers. Construction is pictured in Abbotsford, B.C., on Tuesday, Nov. 10, 2026. (Ethan Cairns/CBC)

Ottawa says a comprehensive flood mitigation plan for the Sumas Prairie remains under development. The region is pictured in Abbotsford, B.C., on Jan. 26, 2026. (Ben Nelms/CBC)



