卑诗Kimberley市为冬季清雪做准备,但2025年圣诞前夕市政设施火灾损失的两辆铲雪用卡车及车库尚未完全补齐。运营主管称设备又将露天存放,需提早准备。

市府希望维持服务,但若其他设备故障,清雪速度可能受影响,呼吁居民耐心并通过网上渠道反映问题。附近Cranbrook的平均降雪数据不能直接当作海拔较高Kimberley的降雪量,实际冬季雪况仍有不确定性。

来源:CBC News 原报道。大鱼新闻整理原创中文摘要;保留原刊发日期。

The collapsed and burnt corner of the city's public works building in Kimberley, B.C., in December 2025. (Amber Wang/CBC)

The collapsed and burnt corner of the city's public works building in Kimberley, B.C., in December 2025. (Amber Wang/CBC)

A corner of the public works building was destroyed in the fire, along with two dump trucks, a boom truck, and a mini-excavator. (Amber Wang/CBC)

A corner of the public works building was destroyed in the fire, along with two dump trucks, a boom truck, and a mini-excavator. (Amber Wang/CBC)